UK Mob: 0330 202 0211

UK Tel: 0800 080 3118

sales@securepower.com

Installation up to 60kVA Bypass (Normal Working Hours)

Installation up to 60kVA Bypass (Normal Working Hours)

Installation of up to 60KVA Bypass (Mains Supply to Load Distribution)
The following are assumed for a none site surveyed quote;
- A suitably rated supply is presented within 5m of the bypass panel
- Load distribution board is within 5m of the bypass panel
- No access through walls or underfloor is required
- The engineers have free unhindered access to the equipment
- Live power is available on site, our engineers have the ability for lock out required supplies
- There are no restrictions on tool usage or timing of work
- No time for inductions have been taken into consideration
- Customer to specify required site credentials at least 48hours before installation.

BYPASS-NWH-60kVA Product Overview

Documentation

No Documentation.
Please contact sales@securepower.com for additional details.