1-4kVA UPS Installation (Normal Working Hours)

1-4kVA UPS Installation (Normal Working Hours)

Installation of 1-4KVA UPSThe following are assumed for a none site surveyed quote;- The UPS and bypass are within 2m of the incoming and required power points (Standard IEC Cable length)- no access through walls or underfloor is required- The engineers have free unhindered access to the equipment- there are no restrictions on tool usage or timing of work- no time for inductions have been taken into consideration- customer to specify required site credentials at least 48hours before installation

INST-NWH-1-4 Product Overview

Installation of 1-4KVA UPSThe following are assumed for a none site surveyed quote;- The UPS and bypass are within 2m of the incoming and required power points (Standard IEC Cable length)- no access through walls or underfloor is required- The engineers have free unhindered access to the equipment- there are no restrictions on tool usage or timing of work- no time for inductions have been taken into consideration- customer to specify required site credentials at least 48hours before installation

Documentation

No Documentation.
Please contact sales@securepower.com for additional details.