5-9kVA UPS Installation (Outside of Normal Working Hours)

5-9kVA UPS Installation (Outside of Normal Working Hours)

Installation of 5-9KVA UPS, including Bypass (Out of Hours)The following are assumed for a none site surveyed quote;- The UPS and bypass are within 3m (5m cable length) of the incoming and required power points- no access through walls or underfloor is required- The engineers have free unhindered access to the equipment- live power is available on site, our engineers have the ability for lock out required supplies- there are no restrictions on tool usage or timing of work- no time for inductions have been taken into consideration- customer to specify required site credentials at least 48hours before installation.

INST-OOH-5-9 Product Overview

Installation of 5-9KVA UPS, including Bypass (Out of Hours)The following are assumed for a none site surveyed quote;- The UPS and bypass are within 3m (5m cable length) of the incoming and required power points- no access through walls or underfloor is required- The engineers have free unhindered access to the equipment- live power is available on site, our engineers have the ability for lock out required supplies- there are no restrictions on tool usage or timing of work- no time for inductions have been taken into consideration- customer to specify required site credentials at least 48hours before installation.

Documentation

No Documentation.
Please contact sales@securepower.com for additional details.