Secure Power Installation SP-INTEC-8-10

Secure Power Installation SP-INTEC-8-10

Basic Installation of 8-10KVA UPS The following are assumed for a none site surveyed quote; -The UPS is within 3m of the 63A incoming supply -No access through walls or underfloor is required -Live Power is available on site and a 63A commando is presented in the room -Engineers to deliver and install UPS in to position -UPS to be supplied with 3m of Cable and 63A commando -Removal and disposal of existing UPS equipment -Normal Working Hours -UK Mainland Only -Any additional work will be chargeable

SP-INTEC-8-10 Product Overview

Basic Installation of 8-10KVA UPS The following are assumed for a none site surveyed quote; -The UPS is within 3m of the 63A incoming supply -No access through walls or underfloor is required -Live Power is available on site and a 63A commando is presented in the room -Engineers to deliver and install UPS in to position -UPS to be supplied with 3m of Cable and 63A commando -Removal and disposal of existing UPS equipment -Normal Working Hours -UK Mainland Only -Any additional work will be chargeable

Documentation

No Documentation.
Please contact sales@securepower.com for additional details.